Licensed Nebraska Swimming Pool Contractor · Omaha, NECall or text for a free consultation: (402) 819-9481
Home / Our Process

Our pool building process

From the first conversation to the first swim — here is how a typical Aqua Sun pool comes together, shown with photos from our own job sites.

Most projects are completed in 6–8 weeks

Timing depends on weather, pool type and site conditions. With hands-on owner involvement, your project stays on schedule.

Phase 01

Plan

We listen first, then set the design and the layout on site.

  1. Pool location marked out and ready for excavation

    Free consultation & design

    It starts with a conversation. Share a few details and your property survey, and we'll design a pool that fits your space, style and budget.

  2. Excavation beginning for a new inground poolPool excavation with the deep end dug out

    Layout & excavation

    We mark the pool's location on site and excavate to the planned shape and depths.

Phase 02

Build

The structure goes in, then plumbing, the deck and the liner.

  1. Steel wall panels and bracing installed for a vinyl liner poolBraced pool wall panels set in the excavation

    Steel walls and bracing

    Steel wall panels are set, leveled and braced to form a strong, square structure for the pool.

  2. Concrete truck pouring the collar around the pool walls

    Concrete collar

    A concrete collar is poured around the walls to lock the structure in place before the plumbing goes in.

  3. Pool plumbing lines run around the pool walls

    Plumbing

    Plumbing lines are run around the pool and back to the equipment pad, ready for the pump and filtration system.

  4. Gravel backfill and plumbing inside the pool shell

    Backfill

    The area around the pool is backfilled to support the walls and protect the plumbing.

  5. Smooth troweled pool floor ready for the linerPaver coping installed with safety cover on the pool

    Floor and coping / pool deck

    The pool floor is prepared, then we set the coping and build the deck, in concrete or pavers.

  6. Vinyl liner set in place before filling

    Liner

    The custom vinyl liner is installed and the pool is filled, seating the liner against the walls and floor.

Phase 03

Finish

The final details that turn a new pool into a finished backyard.

  1. Finished pool with a stacked-stone water feature wall and dark liner

    Finishing touches & first swim

    Water features, pergolas, retaining walls and landscaping bring the backyard together. Then it's time to dive in.

Free consultation

Let's plan your pool

Book a free consultation and we'll walk you through design options, timeline and financing for your backyard.

CallFree Quote